Ilham, Muhammad Inal (2024) USULAN INTERVAL WAKTU PREVENTIVE MAINTENANCE PADA WORK STATION GRANULATION UNIT SYSTEM E000- E002-120 E0106 DI PT. PUPUK ISKANDAR MUDA. S1 thesis, Universitas Malikussaleh.
Text
MUHAMMAD INAL ILHAM_200130030_COVER.pdf Download (18kB) |
|
Text
MUHAMMAD INAL ILHAM_200130030_ABSTRAK.pdf Download (13kB) |
|
Text
MUHAMMAD INAL ILHAM_200130030_BAB I.pdf Download (74kB) |
|
Text
MUHAMMAD INAL ILHAM_200130030_DAFTAR PUSTAKA.pdf Download (80kB) |
|
Text
MUHAMMAD INAL ILHAM_200130030_USULAN INTERVAL WAKTU PREVENTIVE MAINTENANCE PADA WORK STATION GRANULATION UNIT SYSTEM E000-E002-120 E0106 DI PT. PUPUK ISKANDAR MUDA.pdf Restricted to Registered users only Download (2MB) |
Abstract
Work Station Granolation Unit System merupakan sebuah work station yang berfungsi sebagai tempat finishing urea seed menjadi urea granule. Perusahaan sering mendapati masalah pada work station ini, permasalahan itu berupa terhambat atau bahkan berhentinya proses produksi. Hal ini disebabkan karena seringnya terjadi kerusakan tiba-tiba pada mesin operasi. Salah satu penyebabnya, dalam rentang waktu 2016 s/d 2023 terdapat 143 kerusakan yang terjadi dan menyebabkan downtime sebesar 1550 jam dengan rata-rata 10,839 jam/kerusakan. Kerusakan tersebut menyebabkan kerugian berupa kegagalan produksi urea granule sebesar 100.856,165 ton per periode 2016 s/d 2023 atau 45,16% per kerusakan. Untuk mengatasi permasalahan tersebut maka perlu dilakukan preventive maintenance agar mencegah terjadinya kerusakan yang menyebabkan kegagalan produksi secara tiba-tiba. Berdasarkan pengolahan data, didapati interval waktu preventive maintenance, waktu perawatan yang optimum terhadap 25 komponen kritis yaitu: Rubber Coupling Air E62-GB601 (9.660 jam), Rubber Joint E62-GB604 (60 jam), Gaket E62-GB604 (60 jam), Bearing E62-GA602A (4.452 jam), PG Disch E62- GA605A (3.0678 jam), Nozzle E62-MA601 (4.741 jam), Line E62-MA601 (6.540 jam), Kontektor E62-JD601 (16.632 jam), Screen E62-FD601A (76.921 jam), Rubber Joint E62-FD601B (11.142 jam), Arm Screen E62-FD601B (264 jam), V Belt E62-FH601A (9.709 jam), Twist Belt E62-FH601A (5.476 jam), Twist Belt E62-FH601B (7.001 jam), V Belt E62-FH601B (41.125 jam), Bearing Pulley E62- JF601 (8.200 jam), Belt E62-JF602 (10.972 jam), Pulley E62-JF602 (8.304 jam), Vibrator E62-JF603A/B (3.012 jam), Manhole E62-JF603A/B (84 jam), Stationary Part E62-GB605 (4.920 jam), Belt E62-JD603 (9.100 jam), Bearing Pulley E62-JD603 (52.641 jam), Pulley E62-JD604 (1.392 jam), Belt E62-JD604 (5.652 jam)
Item Type: | Thesis (S1) |
---|---|
Subjects: | H Social Sciences > HD Industries. Land use. Labor H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management T Technology > TJ Mechanical engineering and machinery |
Divisions: | Fakultas Teknik > 26201 - Jurusan Teknik Industri |
Depositing User: | Inal Muhammad Inal Ilham |
Date Deposited: | 21 Oct 2024 09:02 |
Last Modified: | 21 Oct 2024 09:02 |
URI: | https://rama.unimal.ac.id/id/eprint/6996 |
Actions (login required)
View Item |