Jamiul, Husna (2024) PENYELESAIAN SECARA DAMAI TERHADAP WANPRESTASI DALAM PELAKSANAAN KONTRAK KERJA KONTRUKSI PEMBANGUNAN SPBU PERTAMINA DODO ANTARA CV. ERAS GROUP DENGAN PT. PINTU RIME GAYO ENERGI. S2 thesis, Universitas Malikussaleh.
Text
cover tesis .pdf Download (15kB) |
|
Text
abstrakh.pdf Download (13kB) |
|
Text
bab 1 s.pdf Download (54kB) |
|
Text
dapus s.pdf Download (15kB) |
|
Text
TESIS (1).pdf Restricted to Registered users only Download (1MB) |
Abstract
SUMMARY JAMIUL HUSNA RESOLUTION BY MEDIATION DISPUTE FOR 217410102021 DEFAULT OF PERTAMINAD ODO SPOT CONSTRUCTION CONSTRUCTION WORK CONTRACT BETWEEN CV. ERAS GROUP WITH PT. PINTU RIMEGAYO ENERGY (Research Study In (Dr. Marlia Sastro S.H., M.Hum and Dr. Ramziati, S.H., M.Hum) Mediated settlement of defaults in the implementation of the gas station construction work contract between CV. Eras Group with PT. Pintu Rime Gayo Energi was carried out due to a breach of contract in the form of a delay in the distribution of funds by one of the parties which resulted in a delay in completing the construction of the gas station which had been agreed upon by both parties based on contract No.1/SPK-SPBU/PRGE-ERAS/III/2022. Defaulting on the work contract results in losses for the parties and society. The purpose of this research is to examine and analyze the mediation resolution of defaults on construction work contracts for the construction of the Pertamina Dodo Pintu Rime Gayo Energi gas station, to analyze and examine the obstacles and efforts in resolving mediation defaults on construction work contracts for the construction of Pertamina Dodo Pintu Rime Gayo Energi gas stations. This research uses a qualitative type of research, an empirical juridical research approach, this research is prescriptive in nature, the research location is in Gemasih Village, Pintu Rime Gayo District, Bener Meriah Regency, data collection sources consist of primary and secondary data. The results of the research show that the results of mediation in resolving the default on the construction work contract for the construction of the Pertamina Dodo gas station between CV. Eras Group with PT. Pintu Rime Gayo Energi, namely the parties agree to extend the contract payment time, continue cooperation, give a warning letter to villages that have not paid their deposits, deposit funds directly into BUMDESMA's account, stop construction temporarily, the first party details all transactions to BUMDESMA. The obstacles in implementing mediation are the lack of professionalism of the mediator in facilitating the parties, the difficulty of determining the time and place to carry out mediation and the lack of supporting infrastructure. Efforts made to resolve defaults on the construction work contract for the construction of the Dodo Pintu Rime Gayo Energi gas station were to maximize the smoothness of mediation, carry out outreach, provide warnings to the parties to improve their professionalism and quality of work. It is recommended that in carrying out mediation on disputes over default on the construction work contract for the construction of the Pertamina Dodo gas station, more intense cooperation should be carried out between the mediator and the parties so that obstacles in the mediation can be controlled well. Apart from that, it is also recommended that both parties continue to work together in completing the construction of the gas station. Keywords: Settlement, mediation, default, employment contract
Item Type: | Thesis (S2) |
---|---|
Subjects: | K Law > K Law (General) |
Divisions: | Pascasarjana > 74101 - Magister Hukum |
Depositing User: | Jamiul Husna Jamiul Husna |
Date Deposited: | 29 Feb 2024 08:25 |
Last Modified: | 01 Mar 2024 08:25 |
URI: | https://rama.unimal.ac.id/id/eprint/1213 |
Actions (login required)
View Item |