Riski, Rosita (2025) ANALISA PERBAIKAN DAMPAK GANGGUAN HUBUNG SINGKAT PADA JARINGAN DISTRIBUSI 20KV DI PT.PLN (Persero) ULP LHOKSEUMAWE KOTA MENGGUNAKAN SOFTWARE ETAP 19. S1 thesis, Universitas Malikussaleh.
![]() |
Text
COVER.pdf Download (236kB) |
![]() |
Text
ABSTRAK.pdf Download (377kB) |
![]() |
Text
BAB 1.pdf Download (370kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (277kB) |
![]() |
Text
SKRIPSI ROSITA RISKI.pdf Restricted to Registered users only Download (2MB) |
Abstract
ANALISA PERBAIKAN DAMPAK GANGGUAN HUBUNG SINGKAT PADA JARINGAN DISTRIBUSI 20KV DI PT.PLN (Persero) ULP LHOKSEUMAWE KOTA MENGGUNAKAN SOFTWARE ETAP 19 ABSTRAK Pentingnya tingkat kehandalan dalam system distribusi tenaga listrik menjadi krusial, karena keberhasilan kinerja system tergantung pada sejauh mana suplai tenaga listrik dapat diberikan secara kontinu kepada pengguna. Dalam sistem kelistrikan yang luas seringkali terjadi gangguan yang berasal dari luar tidak dapat untuk di hindari namun dapat diminimalkan. Gangguan yang dapat mencakup berbagai kondisi seperti kerusakan pada peralatan gangguan hubung singkat, atau faktor-faktor eksternal seperti bencana alam, dampak gangguan hubung singkat dalam system distribusi tenaga listrik terjadi karena sistem distribusi adalah elemen yang berhubungan langsung dengan kebutuhan konsumen. Penelitian ini menggunakan metode Load Flow Analisis dengan software ETAP 19 untuk menganalisis arus gangguan hubung singkat pada jaringan distribusi 20kV serta melakukan perbaikan dampak dari gangguan ULP Lhokseumawe kota. Dengan perhitungan arus gangguan kemudian simulasi load flow dititik Bus 27. Berdasarkan hasil perhitungan arus gangguan tiga fasa adalah sebesar 1,141 KA, arus gangguan dua fasa sebesar 179,137 KA dan arus gangguan satu fasa adalah sebesar 2,42 KA dan antar fasa sebesar 54,4 KA. Pada hasil simulasi arus gangguan yang tertinggi terjadi pada arus gangguan tiga fasa adalah sebesar 1,942 KA, arus gangguan dua fasa sebesar 2,311 KA dan arus gangguan satu fasa adalah sebesar 2,234 KA dan antar fasa sebesar 1,682 KA. Koordinasi proteksi yang diterapkan dalam penelitian ini adalah Fuse yaitu untuk mendeteksi arus gangguan yang melebihi batas dan memutus rangkaian untuk mencegah kerusakan, sehingga arus gangguan di bagian yang terganggu menjadi nol setelah fuse beroperasi. Kata Kunci : Load Flow, Hubung Singkat, ETAP. ANALYSIS OF IMPROVING THE IMPACT OF SHORT CIRCUITS ON THE 20KV DISTRIBUTION NETWORK AT PT. PLN (Persero) ULP LHOKSEUMAWE CITY USING SOFTWARE ETAP 19 ABSTRACT The importance of the level of reliability in the electric power distribution system is crucial, because the successful performance of the system depends on the extent to which the electric power supply can be provided continuously to users. In large electrical systems, interference often occurs that comes from outside which cannot be avoided but can be minimized. Disturbances which can include various conditions such as damage to short circuit equipment, or external factors such as natural disasters, the impact of short circuit disturbances in the electric power distribution system occur because the distribution system is an element that is directly related to consumer needs. This research uses the Load Flow Analysis method with ETAP 19 software to analyze short circuit currents in the 20kV distribution network and repair the impact of Lhokseumawe city ULP disturbances. By calculating the fault current then simulating the load flow at Bus point 27. Based on the calculation results, the three phase fault current is 1,141 KA, the two phase fault current is 179,137 KA and the single phase fault current is 2.42 KA and between phases is 54.4 KA. . In the simulation results, the highest fault current occurred in the three-phase fault current, which was 1,942 KA, the two-phase fault current was 2,311 KA and the single-phase fault current was 2,234 KA and between phases was 1,682 KA. The protection coordination applied in this research is the Fuse, which is to detect fault currents that exceed the limit and break the circuit to prevent damage, so that the fault current in the disturbed part becomes zero after the fuse operates. Keywords: Load Flow, Short Circuit, ETAP.
Item Type: | Thesis (S1) |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Teknik > 20201 - Jurusan Teknik Elektro |
Depositing User: | Rosita Riski |
Date Deposited: | 12 Mar 2025 07:24 |
Last Modified: | 12 Mar 2025 07:24 |
URI: | https://rama.unimal.ac.id/id/eprint/10759 |
Actions (login required)
![]() |
View Item |