![]() | Up a level |
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 1.
Thesis
HANDINI, FITRI (2026) PENGUKURAN BEBAN KERJA DAN JUMLAH TENAGA KERJA DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALEN (FTE) DAN WORK LOAD ANALYSIS (WLA) PADA PRODUKSI TEMPE DI UD. MAWAR SARI. S1 thesis, UNIVERSITAS MALIKUSSALEH.




